Moving Route of Mobile User (IMAGE)
Caption
A pair of identical transceiving test devices (M1 and M2) has been designed to implement the experimental verification. The M1 test device was placed at the 14th floor of our research facility at approximately 45 meters above the mean roof height to serve as a base station. The M2 test device was placed into a car to be moved on the closed route within the surrounding urban environment
Credit
the author's of the article
Usage Restrictions
None
License
Licensed content